Martino
Photography, The GWR, Aviation, Travel, Cars.


MUCH too hot to actually work outside today, or even run the railway. Right now, at 7.30pm it's 91F with 'feels like' index of 105F, so you can imagine what it was like at high noon - or at least after I'd finished watching the Grand Prix. Yesterday was the same.
So, inspired by Steve's signal box build, I dug out my signal box plans kit I picked up when I was in the UK last year and decided to start work. I knew right away that there is no way I can approach Steve's workmanship, but with my bodger's toolbox ready - off we went. (Also working on the first station platform for Farnham Common at the same time, work on when while the other is drying, so to speak.
The workshop isn't air conditioned, but there was fan going, and so, stripped to just a pair of shorts and a bandana (not a pretty sight) .....
I don't think the UK has 'Yard Signs' but they are pretty prevalent here, especially during elections. They look like this.
Any way, we had a pile of old ones at work left over from when Huckabee was running for President. I didn't think he'd want them again, so I liberated a few.
Like this.
I thought these may be a useful material.
Seemed simple to cut them out and start sticking together.
The windows are just in place to get the idea of how it's going, everything like that will come out before a spray of primer, and then the actual windows will be glazed, and pained where required.
Decided to put some stairs and a porch on.
This is the inside, with the floor. Planks (coffee stirrers) were laid, these will be stained and a Back2Bay6 signal box interior fitted.
More progress
Chimney made and fitted
Then a start on the planking.
So, inspired by Steve's signal box build, I dug out my signal box plans kit I picked up when I was in the UK last year and decided to start work. I knew right away that there is no way I can approach Steve's workmanship, but with my bodger's toolbox ready - off we went. (Also working on the first station platform for Farnham Common at the same time, work on when while the other is drying, so to speak.
The workshop isn't air conditioned, but there was fan going, and so, stripped to just a pair of shorts and a bandana (not a pretty sight) .....
I don't think the UK has 'Yard Signs' but they are pretty prevalent here, especially during elections. They look like this.

Any way, we had a pile of old ones at work left over from when Huckabee was running for President. I didn't think he'd want them again, so I liberated a few.
Like this.

I thought these may be a useful material.
Seemed simple to cut them out and start sticking together.

The windows are just in place to get the idea of how it's going, everything like that will come out before a spray of primer, and then the actual windows will be glazed, and pained where required.
Decided to put some stairs and a porch on.

This is the inside, with the floor. Planks (coffee stirrers) were laid, these will be stained and a Back2Bay6 signal box interior fitted.

More progress



Chimney made and fitted

Then a start on the planking.