See the prototypical Northern Pacific MOW-1

Larry Nast

Registered
APRIL FOOLS!!!! The attached pics show what I use for releveling the 200' of mainline track along with a 30' passing siding and 30' staging track on my NP Garden Railroad. My roadbed is roughly 4" deep of crusher dust. With the winter frost and heaving and lowering. It only takes me about an hour to do it in spring and I might do it again in midsummer. MOW-2 is on the production schedule. It will be a gondola which will hold my 6" level for super elevation around my 12' radius curves. Greetings from Green Bay, Wis. USA. Have a great spring nd summerDSCN5207.JPG.DSCN5206.JPG
You must login or register to view hidden content on this page.
 
Back
Top