Removable Bridge.

I've just built a lift-out access bridge for a customer, and supplied it with a 4 ft long cable at one end to provide a semi-permanent electrical connection from the fixed tracks to the bridge tracks. This only works if you can place the bridge fairly close to the abutment when it's open, of course. Depending on the circuit design, the two sides can be connected with a permanent buried cable. It also has an automotive style connector so the lifting section can be removed completely if needed. The cable isn't very elegant, but it does ensure good continuity. He's doing the track himself, so I'm not sure how that's being done.

Andrew
 
Hmm! How do you install an isolation section . . . . . . . . . . for a live steamer? ? ? :-\ ::) ;) ;D ;D ;D
 
Back
Top