When the Sydney Harbour Bridge was built, they load tested it with MANY locos.

(pic from:http://sydney-harbour-bridge.bos.nsw.edu.au/engineering-studies/testing.php)
So the Sandstone and Termite decided on a similar test, when the repairs to the big timber trestle were completed..

This video shows it better. [size=12pt]http://youtu.be/U-9ZjaK52jA[/size]

(pic from:http://sydney-harbour-bridge.bos.nsw.edu.au/engineering-studies/testing.php)