As I reassemble little snippets of advice will pop up - worth mentioning, you never know, some of you might be as dim as me, unlikely, I know. Replacing the chimney was a very awkward bit. The snag is the brown and black wires have to be poked away from the chimney hole, and this was done most unprofessionally. What with poking the wires out oif the way, and then the chimney spindle catching nipping them time after time, I started to tear the plastic insulation. I've got the thing in now, but I am not at all happen about the state of those two wires either side of the chimney spindle. It has just added another vulnerable point. I will continue and pretend everything is OK, but if the light fails I will think seriously about routing those two wires down the inside of the boiler to keep them away from any snagging of this nature, maybe even think of boring a hole in the backplate and provide a sheath of some sort. You all with me? Anyway, here we are, Friday morning, things look OK so far, eh?
