Two large trees in a neighbouring garden were trimmed quite a bit last week which left a fair bit of sawdust and branches about, so started to clear it up so that the new lgb steeple cab set could use the freight siding.
Since the outside loop was first laid, the cross over into the large loop and access to the wood yard sidings, has always been problematic for larger stock. so today I decided to re lay the track with some flexi track bringing the line around the curve. Then move the cross over more to the left, just need a point to re connect them. larger trains now can run a lot smoother.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.