No doubt eying it up for demolition or possibly repair?Fred was out today to inspect the latest building on the line
View attachment 312255View attachment 312256
No doubt eying it up for demolition or possibly repair?Fred was out today to inspect the latest building on the line
View attachment 312255View attachment 312256
It’s coming on well Sam.the two loops have been connected so trains can run in both directions, as well as the shuttle which will be extended in the future,
View attachment 319167View attachment 319168View attachment 319169View attachment 319170View attachment 319171
Well, toucan play at that game...I see I'm not the only one that has a flamingo by the tracks.
Proving, once again, it's impossible to have too much stuff!Purpose built workshop is now fitted out, a few more bits to tidy up here and there,
View attachment 333151View attachment 333152View attachment 333153View attachment 333154
ObscenePurpose built workshop is now fitted out, a few more bits to tidy up here and there,
View attachment 333151View attachment 333152View attachment 333153View attachment 333154
I like your butterfly!
Ah, but with all that stuff, it probatakes a few days to decide what to run, and by that time it's rainingObscene