Lazy Grange Bay 3...a new start

well today was really quite good.. got a few things done, and ran a few differnt trains.. nice when it happens..










 
Coming on nicely, Mike
Good to be able to refine on reworking a well tried layout
 
Nice trees. ;D
 
ta guys, yesterday i got the railclamps done along with the power feeds in ,and wired uop, also got the baslting done. oft to bath tommkow for 5 days, so might be missing.. . photo from yesterday, got a lot done, or things fell into place, as stuff just happens here..

 
mike said:
oft to bath tommkow for 5 days
You'll come out looking like a prune! :D
Grand job on the railway though, all those little details really make it great.
 
pugwash said:
You'll come out looking like a prune! :D
Grand job on the railway though, all those little details really make it great.

If he shrivels up any more, he can be a scenic detail at Lazy.....
 
ta guys!!..swaped over two left handed points for 2 right handed ones.. nmeans ialble to us the line as a passing loop....other nws, a new an ahfternon, its been striped down and is being repaitqaNS and modified

 
Rhinochugger said:
so what was wrong with Dunlop tyres? :( :( :( :(
Mike doesn't model French prototypes :D

As for the tyres, had them on the Jag. Awful.
 
bit of a vidio on my samsung s6 edge
https://youtu.be/dWIqid7uLNg
 
Love it, love it....the second great video I have seen on the forum today....Thank you Mike.
Kev
 
thank you.. i have been working on a level crossing ,its needed for the entrances to the goods shed..










 
and a gate keepers cpttage..







 
The level of detail in your work never ceases to amaze me.
 
Excellent photos, Mike. Great idea for an orphan Rigi cable car !!
 
Back
Top