The Logging, Gravel & Brickworks Railway

Posted by: GIZLIZ May 4 2009, 03:18 PM
After travelling through the Tunnel at the station throat, you cross Sheringham South Junction, passing the yard on your left, via Pebble Beach and Glasshouse Crossing....
 
Posted by: GIZLIZ May 4 2009, 03:34 PM
The line then curves left, towards Quarry Junction. We can branch left onto the Down Main, or route directly ahead onto the Up main....
 
Posted by: GIZLIZ May 13 2009, 02:22 PM
Future plans for Weybourne Station are to include signalling at the platforms. I have a couple of Playmo signals which I intend to modify.

The platform tracks lines marked in red and yellow are configured as reversal loops, and they currently use the LGB 1015T reversing track set to change the polarity. However, I want to make the red track bi-directional, so I am going to use the point motor to reverse the polarity by means of a pair LGB Type 2 Supplementary Switches....
 
Posted by: GIZLIZ May 13 2009, 02:25 PM
I've never used these Supplementary Switches before, and I was proposing to fit one to this Point Motor at Weybourne North Junction....
 
Posted by: GIZLIZ May 13 2009, 02:28 PM
Easier to fit than I thought.

Remove the 'lid' of the motor, un-clip the panel by the tie bar mechanism, clip in the TTSS, and refit the lid.

Job's a good 'un....
 
Back
Top