I have the opportunity to include a tunnel! on the current section, I have had tunnels on previous lines which posed no problem, the proposed site on the current line I think meets all the criteria which would mnean it should be trouble fre (ie No longer than 1.75 arms length so that access can be gained to extract any derailed stock and clean track,wide enough so that any derailed stock would stand a chance of not being scraped along the inside walls, and the track within the tunnel would have several power feeds)
So what is the consensus do I go ahead or not??!!
Note in the aerial view the last vehicle is a DR bogie goods van the tunnel mouth proposed would be around 1/2 way along its length.
Some pics, showing the the proposed site of the tunnel, it would be approx the length of the train minus 1/2 the last vehicle.