Woodlock Logging

duncan1_9_8_4

Jack of all trades on the Railway
25 Oct 2009
3,362
513
40
Pontefract, West Yorkshire
Best answers
0
Country flag
It's all looking brilliant this year.
Thanks. I've put a bit more focus on the track etc this year making sure it's easy to use when I want to. Nothing worse than having to do jobs on the line before running it.
 

Paul M

Registered
25 Oct 2016
12,049
1,729
61
Royston
Best answers
0
Country flag
Thanks. I've put a bit more focus on the track etc this year making sure it's easy to use when I want to. Nothing worse than having to do jobs on the line before running it.
That is is problem with ground level lines. Personally I prefer them, but it does mean a lot of clearing needs to be done before a session
 
  • Like
Reactions: 1 user

duncan1_9_8_4

Jack of all trades on the Railway
25 Oct 2009
3,362
513
40
Pontefract, West Yorkshire
Best answers
0
Country flag
Points wired up after work. Need to hide all the wire, can't stand visible wire. Tamp and ballast the sliding. General scenery stuff.
PXL_20240628_174905678.jpgPXL_20240628_174839517.jpgPXL_20240628_174738311.jpg