Hartlebury Valley Railway

Well the Beast shed has arrived. Have cut out the track entry and exit doors but still need to trim them and hinge them etc and fit some sort of locks. Track is laid into the shed but I still have to construct 500mm base boards inside for the track to run on. Electrics all done as well, that was first job to get some power and light.2F128643-099C-4847-9487-99AE72793855.jpeg36AAAC2D-F7DA-4B97-A539-772E893CC583.jpegADFED460-8DB3-46F4-9BD4-B5E510BE840E.jpeg9214C6F2-6B59-43FD-B7AB-2922E3983223.jpeg
 
Very nice. Are they R2 curves at the end? I would love a Harz 2-10-2 but have a few R1s in my layout.

What happens inside the shed ;)
 
Very nice. Are they R2 curves at the end? I would love a Harz 2-10-2 but have a few R1s in my layout.

What happens inside the shed ;)
Hi R3 curves all round. Inside the shed the twin tracks link up in order to form continuous running loops! The LGB Harz 2-10-2 will run on R1’s though...
 
Fits in extremely well, excellent planning.
 
Hi finished hinging the train track doors and put a framing around the outside using some treated timber which the shed erector guys left me. Also made a start on the framework for the baseboards inside the shed.93694761-B644-484F-AAE9-85F9D81A8663.jpeg8632DD6F-0F32-4BAA-9513-4922695D094C.jpeg4A3B0685-94BF-4E45-822B-BDCBEC7D76C0.jpegAF4BE0A5-52E9-4EBF-A028-8CB03DF00350.jpegFB97AEFA-DA3D-40C8-9FF9-80B61C7F6B78.jpeg53DE4698-9A37-4824-8A8A-E3FE9BC1C9A1.jpeg
 
Looking great in there. I think a shed/stock storage yard is the one thing I wish I could have incorporated into my line.
 
Looking very nice. Planning on automating those train track doors ;)? I would be very tempted myself....
 
Hi the build continues with the base boards now added onto the framework in the shed. Track provisionally laid out and have had to order some more R3 curves to complete.32095B28-EEF8-44E4-8DD0-F0A0CFCDC0D6.jpeg6A09B159-ADA2-47BD-9BCA-8285530F3A29.jpeg406D761C-3CA8-4A4D-9CD8-04969513CB39.jpeg721BCCA9-585D-42BF-B145-40F23F0D72DA.jpeg517F3059-6A2E-45F7-B290-3E077FE1B000.jpeg
 
First run around inner loop with sumpter valley mallet, a 40th birthday present to myself 12 years ago just waiting for some more track to finish the outer loop off in the shed. Ahhh... it’s good to be able to run trains again. I’ve missed them for the 8 months since we moved1761CC57-E4B0-4AC1-AF86-8E4CBF795A23.jpegE47297EA-AFAB-416D-8A55-198B3D39FF80.jpegFBF09E6A-8913-4CA1-8327-7F1AFC6343FE.jpeg8865BE98-FA98-4607-8203-D218528BA7EC.jpeg,
 
Very jealous of your shed! Have you shelves for storing additional rolling stock?
No shelves yet but just on the double track mainline inside the shed you can store two complete trains. I have a couple of sidings in the shed as well but might need addition storage shelves at some point!
 
Back
Top