The Logging, Gravel & Brickworks Railway

V52 proceeds to the exhange siding at Sheringham....
90b3be7565d74a2bbea8d78ede1cc2e6.jpg
 
The OEG wagans are hauled through Sheringham tunnel into the terminus....

0b3769e5c85e4369a41f510c4f04dd4c.jpg
 
Once in the station, V52 is uncoupled ready to run round the train....

437f375efce0493bb559960dcd10318b.jpg
 
V52 backs down the headshunt....

da5fb7d8deea45eebe62390f74291922.jpg
 
Loco runs round the train....

6b02f3ae1282440f956f2a0be3045c75.jpg
 
Backing on to the train....

a02639f4ea164e8ead254352ddb7d911.jpg
 
Train now en route to Weybourne Yard, passing Sheringham South Junction....

975cc9cdcc4346d993a30171f9bf73d5.jpg
 
Round the curve at Quarry Junction....
16119d9bc66a438b894d391e4dc42b4c.jpg
 
At Weybourne North Junction, the train takes the route into the Yard....
 
Weybourne Yard is busy as usual....
 
The crane train was stabled at Weybourne, having assited with earlier track repairs in the yard....
 
The train is pushed back into the Quarry siding, which can only handle 3 wagons at a time....
 
The other portion of the train has to be moved back into the yard, whilst the other wagons are loaded....
 
V52 is uncoupled from the empty portion of the train and moves forward onto the main line....
 
As Weybourne Yard sidings are all occupied, V52 has to work back wrong road to the Quarry siding....
 
V52 couples up the the now loaded portion of the train, ready to haul it forward....
 
Train now proceeds along the Down Main Line....
 
Once past the Weybourne Yard exit, the train stops to push back into the siding....
 
Loaded wagons are propelled back into the Yard....
 
And the train is now marshalled with the empties at the rear....
 
Back
Top