Woodlock Logging

New extension in service and all points are now motorised
DSC_0028.JPG DSC_0027.JPG DSC_0026.JPG DSC_0025.JPG DSC_0024.JPG DSC_0023.JPG DSC_0021.JPG DSC_0019.JPG DSC_0018.JPG DSC_0017.JPG
 
This is the first time I've had to catch up on this layout's entire build thread, it's terrific, proof great things come is small packages.
 
Tram loco on hire.... Don't think it looks bad with the US coach.
DSC_0096.JPG DSC_0094.JPG DSC_0093.JPG DSC_0095.JPG
 
Some track rationalisation today and a few bits and bobs moved. Out with the mothballed siding that hasn't been used for much traffic since built. And because aristocraft points are rubbish. The wagon shed now spans two sidings in the yard and the signal has been moved to the running line. Just waiting for my r1 corner to slot in where the points were.
DSC_0009.JPG DSC_0011.JPG DSC_0010.JPG DSC_0012.JPG DSC_0007.JPG DSC_0008.JPG
 
Bit chilly today but trains still ran!
DSC_0020.JPG DSC_0019.JPG DSC_0018.JPG
 
I really like the Shleich Horse Arena.... I use them as a loco shelter. And I have decided to extend them to fit my biggest loco or coaches underneath.DSC_0025.JPG DSC_0023.JPG DSC_0022.JPG DSC_0027.JPG DSC_0024.JPG
 
You've done some nice work since I last visited your posts.
 
After nearly a year of the railway been mothballed, operations have now resumed after extensive work getting the track ready and a new lawn. DSC_0001.JPGDSC_0002.JPGDSC_0003.JPG
 
Back
Top