cheers ian.
..i thougt so as well.. the drainage might be a issue, but i do have a plan.. waiting till ive got most of the painting done, lights to do ect, last job before i install it, minus the boiler house and chimmy.. is to add the drainpipe at the front..were the colum of brick work is raised in the center..a drain pipe is going, i have to make the trough ,ect yet, and that means cutting out,into the roof.. hensce, the drain.. on the roof, i still have to make, the roof to the stair well, and the large water tank, and brick wall surports.. then the roof it self, is getting covered in ballest..same as the track,/.. so theres a bit to do yest.. but today, i think i got the bricks done...
Rhinochugger said: