The passing loops will hold a five/six coach train and loco. But it`s supposed to be two platforms with a middle through running line.
Think the head shunt will need adjustment for a wider platform.
Any how today (Saturday) as it`s getting close to Sunday as I type, has seen the cementing of those cut triangles, and them some testing, with almost all my stock, bar 4 wagons.
The blue glow is the Massoth`s display inside the shed.
Finally the end for tonight.
There were some videos taken as well, for up loading to U tube tomorrow, or is that today!!
http://youtu.be/wckeAKzr9zo
http://youtu.be/w_3Lvj9EkF4
Don`t know what has gone wrong with U tube, but looks as if I carn`t up load videos to my channel, had to select a duplicate one.